7.     ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE

 

7.1   Environmental Exceedance

 

7.1.1       No Action / Limit Level exceedance was recorded for 24-hr TSP and construction noise at KTD1a, KTD2a and KER1b in the reporting month.

 

7.2   Complaints, Notification of Summons and Prosecution

 

7.2.1       A complaint received on 9 February 2017 was referred from EPD on 21 February 2017 and summarized as below:

 

l   No car washing machine was found in the construction site near the gate of former Radar Tower (hereinafter referred to as ¡§the Site¡¨).

l   Dust was observed when the vehicle leaving and entering the Site.

 

The notification of complaint was received by ET on 22 February 2017.

 

7.2.2       Cumulative complaint log, summaries of complaints, notification of summons and successful prosecutions are presented in Appendix L.