Summary
of Site Audit in the Reporting Month
| Parameters | Date | Observations
   and Recommendations | Follow-up | 
| Air Quality |  24 August
  2017 | Contractor was reminded to cover stockpiles with impervious sheetings properly. (Portion I) | The item was rectified by the Contractor and inspected on
  31 August 2017. | 
| 31 August 2017 | Open stockpiling of C&D materials shall be covered properly.
  Impermeable sheeting shall be provided. (Zone 1) | The item was rectified by the Contractor and inspected on
  7 September 2017. | |
| Noise | 31 August 2017 | Appropriate noise absorption material shall be provided to the
  operating breaker. (Zone 4) | The item was rectified by the Contractor and inspected on
  7 September 2017. | 
| Water Quality | 3 August 2017 | Waste water treatment system shall be improved to prevent the
  accumulation of muddy water and water seepage at the low lying area at
  Portion I. Contractor was recommended to separate the discharge point and the
  desilting pond, seal the concrete blocks, and provide additional pumps.
  (Portion I) | The item was rectified by the Contractor and inspected on
  10 August 2017. | 
| Chemical and Waste Management | 10 August 2017 | Cement residue was found in the public haul road. Impermeable sheeting
  shall be provided when loading the cement. (Zone 2) | The item was rectified by the Contractor and inspected on
  17 August 2017. | 
| Land Contamination | NA | ||
| Landscape and Visual Impact | 3 August 2017 | Decorative hoardings shall be provided along Shing Cheong Road. | The item was rectified by the Contractor and inspected on
  17 August 2017. | 
|  24 August
  2017 | Contractor was reminded to cover stockpiles with impervious sheetings properly. (Portion I) | The item was rectified by the Contractor and inspected on
  31 August 2017. | |
| 31 August 2017 | Open stockpiling of C&D materials shall be covered properly.
  Impermeable sheeting shall be provided. (Zone 1) | The item was rectified by the Contractor and inspected on
  7 September 2017. | |
| General Condition | 17 August 2017 | Contractor was reminded that the low-lying area at Portion I shall be
  kept clear of silt, dusty or muddy materials. (Portion I) | The item was rectified by the Contractor and inspected on
  24 August 2017. |