Summary
of Site Audit in the Reporting Month
|
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
||
|
Air Quality |
30 November 2017 |
Plants and
equipment should be well-maintain to prevent dark smoke emission (Zone 4).
Contractor should maintain plant and equipment to prevent dark smoke
emission. |
The item was rectified by the Contractor and inspected on
6 December 2017. |
||
|
Noise |
NA |
||||
|
Water Quality |
NA |
||||
|
Chemical and Waste Management |
30 November 2017 |
Contractor was reminded to store
chemicals in drip tray (Zone 1). Drip tray shall be provided. |
The item was rectified by the Contractor and inspected on
6 December 2017. |
||
|
Land Contamination |
NA |
||||
|
Landscape and Visual Impact |
NA |
||||
|
General Condition |
NA |
||||