8.1.1
The
Contractor has implemented environmental mitigation measures and requirements
as stated in the EIA Reports, the EP and the EM&A Manuals. The implementation
status of the mitigation measures during the reporting month is summarized in Appendix
J. Status of required submission under the EP during the reporting
period is summarized in Table 8.1.
Table
8.1 Status of
Required Submission under Environmental Permit
|
EP Condition |
Submission |
Submission Date |
|
EP-337/2009 |
||
|
Condition 2.3 |
Management Organization of
Main Construction Companies |
18/12/2015 |
|
Condition 2.4 |
Design Drawing of the Project |
18/12/2015 |
|
Condition 2.11 |
Landscape Mitigation Plan(s) |
18/12/2015 |
|
Condition 3.3 |
Monthly EM&A Report (November 2017) |
13/12/2017 |
|
EP-339/2009/A |
||
|
Condition 2.4 |
Management Organization of
Main Construction Companies |
18/12/2015 |
|
Condition 2.5 |
Design Drawing of the Project |
18/12/2015 |
|
Condition 3.3 |
Monthly EM&A Report (November 2017) |
13/12/2017 |
|
EP-451/2013 |
||
|
Condition 2.3 |
Management Organization of
Main Construction Companies |
18/12/2015 |
|
Condition 2.4 |
Design Drawing of the Project |
18/12/2015 |
|
Condition 2.5 |
Landscape Mitigation Plan(s) |
18/12/2015 |
|
Condition 2.10 |
Supplementary Contamination
Assessment Report |
18/12/2015 |
|
Condition 3.3 |
Baseline Monitoring Report |
12/02/2016 |
|
Condition 3.4 |
Monthly EM&A Report (November 2017) |
13/12/2017 |