Summary of Site Audit in the Reporting Month

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

8 February 2018

 

Contractor was reminded to conduct frequent watering on excavation area to suppress dust (Zone 2).

 

The item was rectified by the Contractor and inspected on 14 February 2018.

14 February 2018

 

Open stockpile were observed (Zone 4). Open stockpile shall be removed or cover properly.

 

The item was rectified by the Contractor and inspected on 22 February 2018.

Noise

NA

Water Quality

 

22 February 2018

 

Debris and silt were found near the drainage opening (Zone 2). Sandbag or other mitigation measures should be provided.

 

The item was rectified by the Contractor and inspected on 1 March 2018.

Chemical and Waste Management

14 February 2018

 

Leakage of drip tray was observed (Zone 1). The drip tray shall be removed or replaced.

 

The item was rectified by the Contractor and inspected on 22 February 2018.

14 February 2018

 

Open stockpile were observed (Zone 4). Open stockpile shall be removed or cover properly.

 

The item was rectified by the Contractor and inspected on 22 February 2018.

Land Contamination

NA

Landscape and Visual Impact

14 February 2018

 

Open stockpile were observed (Zone 4). Open stockpile shall be removed or cover properly.

 

The item was rectified by the Contractor and inspected on 22 February 2018.

General Condition

 

NA