Summary of Site Audit in the Reporting Month

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

1 August 2018

Reminder:

Contractor was reminded to water the bare soil ground surface regularly to suppress dust. (Zone 4)

NA

15 August 2018

Reminder:

Proper label color should be used for NRMM label. (Zone 2)

NA

Noise

NA

Water Quality

15 August 2018

Observation:

The gully should be sealed by concrete bund. Sediments and stagnant water inside the gully should be removed regularly. (Zone 2)

The item was rectified by the Contractor and inspected on 22 August 2018.

Chemical and Waste Management

1 August 2018

Reminder:

Contractor was reminded to remove construction waste properly. (Zone 1)

NA

15 August 2018

Observation:

Chemical containers should be placed on the drip tray. (Zone 3)

The item was rectified by the Contractor and inspected on 22 August 2018.

29 August 2018

Observation:

Different types of waste shall be segregated and handled properly. Unused waste shall be removed regularly.  (Zone 1)

The item was rectified by the Contractor and inspected on 5 September 2018.

Land Contamination

NA

Landscape and Visual Impact

NA

General Condition

 

NA