Summary
of Site Audit in the Reporting Month
|
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
||||
|
Air Quality |
NA |
||||||
|
Noise |
28 Aug 2019 |
Noise mitigation should be provided during breaking. |
NA |
||||
|
Water Quality |
NA |
||||||
|
Chemical and Waste Management |
14 Aug 2019 |
All waste generated at the site should be cleared and
collected frequently. |
NA |
||||
|
28 Aug 2019 |
All waste generated at the site should be collected and
cleared. |
NA |
|||||
|
Land Contamination |
NA |
||||||
|
Landscape and Visual Impact |
NA |
||||||
|
General Condition |
NA |
||||||
|
Permit / Licenses |
14 Aug 2019 |
The NRMM label should be replaced to its proper color. |
NA |
||||